Los Frailes AftermathThe Aftermath According to data provided by both Boliden and the Spanish authorities, the pH level in the upper section of the Rio Guadiamar had returned to normal (about 7) within ten days of the disaster. However, although the total zinc levels decreased rapidly during the first ten days, they are still elevated and are expected to stay this way until the clean-up operation has been completed. It has been decided that no action will be taken to clean up the actual rivers and that it is safer to leave this to natural processes. The latest monitoring data available from the government shows that the total zinc levels in mid-June, in the Entremuros were 94.3 ppm, although the pH was reading 7.3. Following negotiations between the company and the government, it was agreed that the clean-up of the inundated areas along the banks of the rivers would be divided into three sections. Boliden would be responsible for the first section, from the tailings impoundment to the Sanlúcar la Mayor bridge, including the Rio Agrio and Rio Guadiamar, while the government would be responsible for the other two sections from the Sanlúcar la Mayor bridge down to the southern end of the Entremuros. In addition, Boliden has obtained a permit from the government for the disposal of the tailings, removed during the clean-up operations, into the Aznalcóllar open pit. The clean-up officially started on May 3, and it is estimated that a total of 3 million m3 of tailings and contaminated topsoil will have to be removed from Section 1 alone. The aim is to complete the removal of material by the end of September, before the rains start in October. In the badly inundated areas the plan is to scrape the surface off, removing the tailings, topsoil and any vegetation except for the larger trees which can be saved. This is being done with bulldozers and mechanical diggers, and the material is loaded into lorries and taken to the Aznalcóllar open pit for disposal. The rate of clean-up is approximately 20,000 m3/d and, by June 22, a total of 750,000 m3 had been removed, with 684,000 m3 from Section 1, 42,800 m3 from Section 2 and 22,800 m3 from Section 3. In addition to the physical clean-up, both the government and Boliden have instigated detailed investigation programmes and established various committees. The government has set up an internal commission, which includes both the central and the regional government, to co-ordinate the handling of the disaster and to investigate the causes. A technical committee has also been established, to report to the commission, and it has secured the services of two experts to advise the commission, one toxicology specialist and one water specialist. The government is also carrying out a number of monitoring exercises which include water quality analysis for the rivers and wells, and soil sampling from all the inundated areas. The government is also looking at alternatives for treating and discharging the water from the Entremuros area into the Rio Guadalquivir. The options being investigated include filtering the water before discharge or using a bioremediation system in situ to remove the heavy metals from the water before it is released. A consortium of North American and South African companies has been invited by the government to submit a proposal and carry out on-site demonstrations of methods for treating the water. The consortium is looking at the possibility of using high-pressure water cannons to hydrosluice the contaminated areas upstream that cannot be cleaned with mechanical equipment, and then using bacterial stabilisation to purify the water prior to its release. Independently Boliden has established three main project teams to work on various aspects of the investigation project. Environmental Impact Assessment and Reclamation Planning Independent Assessment of the Failure Future Tailings Disposal Options
|
|||||||||||||||
|
|
||||||||||||||||
|
|